Capital Projects

Project Name Description Purpose Location Schedule Site Map Link
           
2300 E Storm Drain Realignment Construction of new storm drain To minimize flood risks to private property. To move storm drain into public ROW for maintenance access. Wrenhaven Lane to I-215 April, 2024 2300 E Stormdrain Realignment (arcgis.com)
2700 E Sidewalks Ph 1 Fills in sidewalk gaps on east and west side Provide pedestrian sidewalks along a busy corridor. 3900 S to Lincoln Lane June to Sept 2024 2700 E Sidewalk Phase 1 (arcgis.com)
Casto Bridge Replacement Bridge replace across the Upper Canal Replacement of bridge at end of life span. 2950 E Casto Lane End of Oct to early Dec, 2024 Casto Ln Bridge Replacement (arcgis.com)
Casto Lane Storm Drain Extension Construction of new storm drain; construction of new curb and gutter; piping open irrigation lateral To separate stormwater from entering into the irrigation lateral. Holladay Blvd to Heather Lynn Ln  Summer 2024 Casto Ln Stormdrain Extension (arcgis.com)
Cottonwood Lane Storm Drain Construction of new storm drain To separate stormwater from entering into the irrigation lateral. 5080 S Cottonwood Lane to Big Cottonwood Creek Summer 2024 Cottonwood Ln Stormdrain (arcgis.com)
Crosswalk Paver Replacement Replace stone pavers Existing pavers are at the end of their lifespan. Murray Holladay Road and 2300 E April or May, 2024 Crosswalk Paver Replacement (arcgis.com)
Hillsden Drive Storm Drain Construction of new storm drain To prevent separate stormwater from entering into the irrigation lateral. 2666 EHillsden Dr to Big Cottonwood Creek Summer 2024 Hillsden Dr Stormdrain (arcgis.com)
Meadowmoore Storm Drain Construction of new storm drain To minimize flood risks to private property. To move storm drain system into public ROW for maintenance access. Gurene Dr to Moor Dale Lane to 1645 E to Fieldcrest Ln to Kings Row Dr. May to Aug, 2024 Meadowmoore Stormdrain (arcgis.com)
Storm Drain Metal Pipe Lining Install new CIPP liner in existing storm drain pipes Rehabilitate corroded metal storm drain pipes to prevent collapse. Various locations April to December, 2024  
5600 S Bridge Replacements Bridge replacement across the Salt Lake and Jordan Canal  Replacement of bridge at end of life span. 1900 E 5600 S October 2024 – March 2025 5600 S Bridge Replacement (arcgis.com)